# Demiton > The overrun that never happens. Five things eat the margin on every job - > rework, missed claims, disputes, cost drift and lapsed compliance - and Demiton catches each one in the register that already > holds the fact, before the cost compounds. It reads the systems a contractor > already runs (ERP, field, payroll, documents) into one set of registers. Built for > Australian self-perform civil contractors at AU$10-150M revenue, 30 to 200 > people, with owned plant. Azure-hosted in Australia, with Australian data > residency. ## The five diseases Each is a moment on a job, and what Demiton does about it. All five protections run every day, each against the registers that hold its facts. Where a register is still empty, the protection says which kind of system would fill it. - **Rework** - The inspection failed. The next stage was already built on top of it. The failed result reaches the person who can stop the next stage the day it lands, with the close-out date attached. Full page: https://demiton.io/diseases/rework - **Missed claims** - The extra work was real, or it rained for four days. Both notices went in late. When the instruction arrives or the rain starts, the clock starts. The notice is drafted and waiting before the window shuts, while the ground is still wet. Full page: https://demiton.io/diseases/missed-claims - **Disputes** - It went to a lawyer, and the record for that week is empty. If the day's record isn't in by evening, you're told which one is missing while people still remember the day. Full page: https://demiton.io/diseases/disputes - **Cost drift** - Nobody saw the job drift until the final account. Drift against the price you quoted is flagged at $50K, not $5M. Full page: https://demiton.io/diseases/cost-drift - **Lapsed compliance** - The insurance lapsed the week the client checked. Every expiry counts down at 90, 30 and 7 days, with the renewal attached. Full page: https://demiton.io/diseases/lapsed-compliance Full page: https://demiton.io/diseases ## Contracts and standards Demiton holds 595 obligations across 107 documents, transcribed clause by clause, each with the window it sets and what missing it costs. No library of law is complete, and Demiton never says this one is. An obligation the library does not hold, and you did not add, is not protected. You can add your own to any job. - **Queensland** (15 documents) - **Aboriginal cultural heritage (Aboriginal Cultural Heritage Act 2003 (Qld))** (1 obligation): https://demiton.io/standards/aboriginal-heritage-acha-2003-qld - **Building and Construction Industry (Portable Long Service Leave) Act 1991 (Qld)** (1 obligation): https://demiton.io/standards/bcipl-leave-act-1991-qld - **Building Industry Fairness (Security of Payment) Act 2017 (Qld)** (9 obligations): https://demiton.io/standards/bif-act-2017-qld - **Environmental authority (Environmental Protection Act 1994 (Qld))** (2 obligations): https://demiton.io/standards/environmental-authority-ep-act-1994-qld - **Environmental Protection Act 1994 (Qld)** (2 obligations): https://demiton.io/standards/ep-act-1994-qld - **Work Health and Safety Regulation 2011 (Qld), Part 4.5 Division 1 (Licensing of high risk work)** (2 obligations): https://demiton.io/standards/high-risk-work-licence-whs-regulation-2011-qld - **Queensland Building and Construction Commission Act 1991** (4 obligations): https://demiton.io/standards/qbcc-act-1991 - **TMR Contract Administration Procedure CAP010M** (1 obligation): https://demiton.io/standards/tmr-cap010m - **TMR MRTS04 General Earthworks** (1 obligation): https://demiton.io/standards/tmr-mrts04 - **TMR MRTS50 Specific Quality System Requirements** (10 obligations): https://demiton.io/standards/tmr-mrts50 - **Queensland TMR Transport Infrastructure Contract** (8 obligations): https://demiton.io/standards/tmr-tic - **Vegetation clearing development approval (Planning Act 2016 (Qld))** (2 obligations): https://demiton.io/standards/vegetation-clearing-planning-act-2016-qld - **Waterway barrier works approval (Fisheries Act 1994 (Qld))** (2 obligations): https://demiton.io/standards/waterway-barrier-fisheries-act-1994-qld - **Work Health and Safety Act 2011 (Qld)** (3 obligations): https://demiton.io/standards/whs-act-2011-qld - **Work Health and Safety Regulation 2011 (Qld)** (8 obligations): https://demiton.io/standards/whs-regulation-2011-qld - **New South Wales** (16 documents) - **Aboriginal objects and places (National Parks and Wildlife Act 1974 (NSW))** (2 obligations): https://demiton.io/standards/aboriginal-heritage-npwa-1974-nsw - **Building and Construction Industry Long Service Payments Act 1986 (NSW)** (1 obligation): https://demiton.io/standards/bci-ls-payments-act-1986-nsw - **Environment protection licence (Protection of the Environment Operations Act 1997 (NSW))** (2 obligations): https://demiton.io/standards/environmental-protection-licence-poeo-act-1997-nsw - **NSW GC21 Edition 2 General Conditions of Contract** (11 obligations): https://demiton.io/standards/gc21-edition2 - **Work Health and Safety Regulation 2025 (NSW), Part 4.5 Division 1 (Licensing of high risk work)** (2 obligations): https://demiton.io/standards/high-risk-work-licence-whs-regulation-2025-nsw - **Building and Construction Industry Security of Payment Act 1999 (NSW)** (9 obligations): https://demiton.io/standards/sop-act-1999-nsw - **Security of Payment Regulation 2020 (NSW)** (1 obligation): https://demiton.io/standards/sop-regulation-2020-nsw - **GC21 (Edition 2) TfNSW General Conditions of Contract (C2-GC21 Ed 2 Rev 19)** (2 obligations): https://demiton.io/standards/tfnsw-c2-gc21 - **C41 Terms for Contracted Work (Minor Physical Works and Services), Transport for NSW** (12 obligations): https://demiton.io/standards/tfnsw-c41 - **TfNSW G2-C2 General Requirements (TS 01566)** (3 obligations): https://demiton.io/standards/tfnsw-g2c2 - **Transport for NSW QA Specification R44 Earthworks** (1 obligation): https://demiton.io/standards/tfnsw-r44 - **TfNSW TS 00088 Minimum Requirements for Contractor Vehicles** (6 obligations): https://demiton.io/standards/tfnsw-ts00088 - **Native vegetation clearing (Local Land Services Act 2013 (NSW))** (1 obligation): https://demiton.io/standards/vegetation-clearing-lls-act-2013-nsw - **In-water works permit and fish passage (Fisheries Management Act 1994 (NSW))** (2 obligations): https://demiton.io/standards/waterway-barrier-fisheries-management-act-1994-nsw - **Work Health and Safety Act 2011 (NSW)** (3 obligations): https://demiton.io/standards/whs-act-2011-nsw - **Work Health and Safety Regulation 2025 (NSW)** (8 obligations): https://demiton.io/standards/whs-regulation-2025-nsw - **Commonwealth of Australia** (13 documents) - **AS 2124-1992 General Conditions of Contract** (3 obligations): https://demiton.io/standards/as2124-1992 - **AS 4000-1997 General Conditions of Contract** (3 obligations): https://demiton.io/standards/as4000-1997 - **AS 4902-2000 General Conditions of Contract for Design and Construct** (4 obligations): https://demiton.io/standards/as4902-2000 - **Building and Construction General On-site Award 2020 (MA000020)** (1 obligation): https://demiton.io/standards/bcgo-award-2020 - **Construction Logistics and Community Safety - Australia (CLOCS-A) Standard** (30 obligations): https://demiton.io/standards/clocs-a-standard - **Job budget tolerance (the contractor's own commitment)** (1 obligation): https://demiton.io/standards/demiton-job-budget-tolerance-au - **Repeat purchases (the contractor's own commitment)** (1 obligation): https://demiton.io/standards/demiton-repeat-purchase-au - **Subcontractor insurance on site (the contractor's own commitment)** (1 obligation): https://demiton.io/standards/demiton-subcontractor-insurance-au - **Fair Work Act 2009 (Cth)** (1 obligation): https://demiton.io/standards/fair-work-act-2009 - **National Prequalification System for Civil (Road and Bridge) Construction Contracts (November 2024)** (2 obligations): https://demiton.io/standards/national-prequalification-system - **Rail Safety National Law (South Australia) Act 2012** (26 obligations): https://demiton.io/standards/rail-safety-national-law-au - **Society of Construction Law Delay and Disruption Protocol** (1 obligation): https://demiton.io/standards/scl-delay-disruption-protocol - **Taxation Administration Act 1953 (Cth), Schedule 1** (1 obligation): https://demiton.io/standards/taa-1953-tpar - **Victoria** (5 documents) - **Construction Industry Long Service Leave Act 1997 (Vic)** (1 obligation): https://demiton.io/standards/cils-leave-act-1997-vic - **Environment Protection Act 2017 (Vic)** (1 obligation): https://demiton.io/standards/ep-act-2017-vic - **Occupational Health and Safety Act 2004 (Vic)** (3 obligations): https://demiton.io/standards/ohs-act-2004-vic - **Occupational Health and Safety Regulations 2017 (Vic)** (4 obligations): https://demiton.io/standards/ohs-regulations-2017-vic - **Building and Construction Industry Security of Payment Act 2002 (Vic)** (9 obligations): https://demiton.io/standards/sop-act-2002-vic - **Western Australia** (8 documents) - **Construction Industry Portable Paid Long Service Leave Act 1985 (WA)** (1 obligation): https://demiton.io/standards/cippl-leave-act-1985-wa - **Work Health and Safety (General) Regulations 2022 (WA), high risk work licences (rr 81 to 85)** (2 obligations): https://demiton.io/standards/high-risk-work-licence-whs-general-regulations-2022-wa - **Main Roads WA Major Works Book 2, Conditions of Contract** (1 obligation): https://demiton.io/standards/mrwa-major-works-book2 - **Main Roads WA Minor Works General Conditions of Contract** (2 obligations): https://demiton.io/standards/mrwa-minor-works - **Main Roads WA Specification 201 Quality Management** (3 obligations): https://demiton.io/standards/mrwa-spec201-quality - **Building and Construction Industry (Security of Payment) Act 2021 (WA)** (10 obligations): https://demiton.io/standards/sop-act-2021-wa - **Work Health and Safety Act 2020 (WA)** (3 obligations): https://demiton.io/standards/whs-act-2020-wa - **Work Health and Safety (General) Regulations 2022 (WA)** (8 obligations): https://demiton.io/standards/whs-general-regulations-2022-wa - **South Australia** (4 documents) - **Construction Industry Long Service Leave Act 1987 (SA)** (1 obligation): https://demiton.io/standards/cils-leave-act-1987-sa - **Building and Construction Industry Security of Payment Act 2009 (SA)** (7 obligations): https://demiton.io/standards/sop-act-2009-sa - **Work Health and Safety Act 2012 (SA)** (3 obligations): https://demiton.io/standards/whs-act-2012-sa - **Work Health and Safety Regulations 2012 (SA)** (8 obligations): https://demiton.io/standards/whs-regulations-2012-sa - **Tasmania** (5 documents) - **Construction Industry (Long Service) Act 1997 (Tas)** (1 obligation): https://demiton.io/standards/cils-act-1997-tas - **Work Health and Safety Regulations 2022 (Tas), high risk work licences (rr 81 to 85)** (2 obligations): https://demiton.io/standards/high-risk-work-licence-whs-regulations-2022-tas - **Building and Construction Industry Security of Payment Act 2009 (Tas)** (7 obligations): https://demiton.io/standards/sop-act-2009-tas - **Work Health and Safety Act 2012 (Tas)** (3 obligations): https://demiton.io/standards/whs-act-2012-tas - **Work Health and Safety Regulations 2022 (Tas)** (8 obligations): https://demiton.io/standards/whs-regulations-2022-tas - **Australian Capital Territory** (5 documents) - **GC21 Edition 2 General Conditions of Contract (ACT v1.8)** (3 obligations): https://demiton.io/standards/gc21-act-v18 - **Long Service Leave (Portable Schemes) Act 2009 (ACT)** (1 obligation): https://demiton.io/standards/ls-leave-portable-act-2009-act - **Building and Construction Industry (Security of Payment) Act 2009 (ACT)** (7 obligations): https://demiton.io/standards/sop-act-2009-act - **Work Health and Safety Act 2011 (ACT)** (3 obligations): https://demiton.io/standards/whs-act-2011-act - **Work Health and Safety Regulation 2011 (ACT)** (8 obligations): https://demiton.io/standards/whs-regulation-2011-act - **Northern Territory** (5 documents) - **Construction Contracts (Security of Payments) Act 2004 (NT)** (5 obligations): https://demiton.io/standards/cc-sop-act-2004-nt - **Construction Industry Long Service Leave and Benefits Act 2005 (NT)** (1 obligation): https://demiton.io/standards/cilslb-act-2005-nt - **Work Health and Safety (National Uniform Legislation) Regulations 2011 (NT), high risk work licences (rr 81 to 85)** (2 obligations): https://demiton.io/standards/high-risk-work-licence-whs-nul-regulations-2011-nt - **Work Health and Safety (National Uniform Legislation) Act 2011 (NT)** (3 obligations): https://demiton.io/standards/whs-nul-act-2011-nt - **Work Health and Safety (National Uniform Legislation) Regulations 2011 (NT)** (8 obligations): https://demiton.io/standards/whs-nul-regulations-2011-nt - **New Zealand** (6 documents) - **Auckland Transport NZS 3910:2013 Special Conditions** (1 obligation): https://demiton.io/standards/at-nzs3910-special-conditions - **Construction Contracts Act 2002 (NZ)** (20 obligations): https://demiton.io/standards/cca-2002-nz - **Job budget tolerance (the contractor's own commitment)** (1 obligation): https://demiton.io/standards/demiton-job-budget-tolerance-nz - **Health and Safety at Work Act 2015** (4 obligations): https://demiton.io/standards/hswa-2015 - **NZS 3910:2013 Conditions of Contract (2013/DZ public-comment redline)** (17 obligations): https://demiton.io/standards/nzs3910-2013 - **NZS 3910:2023 Conditions of Contract (secondary summaries; DZ draft)** (6 obligations): https://demiton.io/standards/nzs3910-2023 - **Ireland** (2 documents) - **Construction Contracts Act 2013 (Ireland)** (14 obligations): https://demiton.io/standards/construction-contracts-act-2013-ie - **Safety, Health and Welfare at Work (Construction) Regulations 2013 (Ireland)** (11 obligations): https://demiton.io/standards/construction-regulations-2013-ie - **England** (4 documents) - **The Construction (Design and Management) Regulations 2015 (Great Britain)** (17 obligations): https://demiton.io/standards/cdm-regulations-2015-gb - **Construction Logistics and Community Safety (CLOCS) Standard, Version 5** (25 obligations): https://demiton.io/standards/clocs-standard-gb - **Housing Grants, Construction and Regeneration Act 1996, Part II (Construction Contracts)** (12 obligations): https://demiton.io/standards/hgcra-1996-part2-gb - **The Scheme for Construction Contracts (England and Wales) Regulations 1998, as amended for England** (7 obligations): https://demiton.io/standards/scheme-construction-contracts-1998-eng - **Ontario** (3 documents) - **Construction Act, R.S.O. 1990, c. C.30 (Ontario)** (32 obligations): https://demiton.io/standards/construction-act-1990-on - **Construction Projects, O. Reg. 213/91 (Ontario)** (10 obligations): https://demiton.io/standards/construction-projects-regulation-1991-on - **Occupational Health and Safety Act, R.S.O. 1990, c. O.1 (Ontario)** (7 obligations): https://demiton.io/standards/ohsa-1990-on - **South Africa** (5 documents) - **Construction Industry Development Board Act, 2000 (Act 38 of 2000)** (3 obligations): https://demiton.io/standards/cidb-act-2000-za - **Construction Industry Development Regulations, 2004** (7 obligations): https://demiton.io/standards/cidb-regulations-2004-za - **Construction Regulations, 2014** (19 obligations): https://demiton.io/standards/construction-regulations-2014-za - **General Administrative Regulations, 2003** (4 obligations): https://demiton.io/standards/general-administrative-regulations-2003-za - **Occupational Health and Safety Act, 1993 (Act 85 of 1993)** (1 obligation): https://demiton.io/standards/ohs-act-1993-za - **Washington State** (11 documents) - **Registration of Contractors, chapter 18.27 RCW (Washington)** (6 obligations): https://demiton.io/standards/rcw-18-27-contractor-registration-us-wa - **Underground Utilities, chapter 19.122 RCW (Washington)** (8 obligations): https://demiton.io/standards/rcw-19-122-underground-utilities-us-wa - **Archaeological Sites and Resources (chapter 27.53 RCW), Indian Graves and Records (chapter 27.44 RCW) and Skeletal Human Remains (RCW 68.50.645) (Washington)** (3 obligations): https://demiton.io/standards/rcw-27-44-27-53-discoveries-us-wa - **Public Works, chapter 39.04 RCW (Washington): subcontractor payment and apprentice utilization** (4 obligations): https://demiton.io/standards/rcw-39-04-public-works-us-wa - **Contractor's Bond, chapter 39.08 RCW (Washington)** (3 obligations): https://demiton.io/standards/rcw-39-08-contractors-bond-us-wa - **Prevailing Wages on Public Works, chapter 39.12 RCW (Washington)** (6 obligations): https://demiton.io/standards/rcw-39-12-prevailing-wages-us-wa - **Interest on Unpaid Public Contracts, chapter 39.76 RCW (Washington)** (4 obligations): https://demiton.io/standards/rcw-39-76-interest-unpaid-public-contracts-us-wa - **Washington Industrial Safety and Health Act, chapter 49.17 RCW (Washington)** (1 obligation): https://demiton.io/standards/rcw-49-17-wisha-us-wa - **Mechanics' and Materialmen's Liens, chapter 60.04 RCW (Washington)** (5 obligations): https://demiton.io/standards/rcw-60-04-mechanics-liens-us-wa - **Lien for Labor, Materials, Taxes on Public Works (retained percentage), chapter 60.28 RCW (Washington)** (8 obligations): https://demiton.io/standards/rcw-60-28-retainage-us-wa - **WAC 296-27-031 Reporting fatalities, inpatient hospitalizations, amputations, and losses of an eye, read with WAC 296-800-320 (Washington)** (3 obligations): https://demiton.io/standards/wac-296-27-incident-reporting-us-wa Full page: https://demiton.io/standards ## Key terms - A **register** is a collection of facts derived from the systems a customer already runs: site diary entries, timesheet lines, plant hours, aged payables, tender notices. You ask for the register, not the system that produced it. The API and MCP tools call a register a shelf. - A **register format** is the shape those facts take once they land, and it is the same shape regardless of which system the record came from. There are 182 registers across 11 domains, every one with a published JSON Schema contract at https://api.demiton.io/api/v1/public/registers - no login. - **Civil Memory** is the layer those registers live in: one continuous record from the public market through to delivery. - **Ask Demiton** exposes this over the Model Context Protocol, so Claude and other MCP hosts can query a contractor's own systems and the public procurement record. - Every external call is identity-bound and audited. Demiton executes work against connected systems; it does not let a model act unsupervised. ## Systems supported - Microsoft Dynamics 365 Business Central (ERP) - Assignar (field operations, site diaries) - Employment Hero Payroll (KeyPay) and Employment Hero HR (Australian payroll and HR) - Xero (accounting) - SharePoint (documents, compliance) - Microsoft Entra ID (identity, SSO) - Claude and other MCP hosts, over the Model Context Protocol (OAuth on every call) ## Commercial model - **Pilot** (AU$8,000 for 6 weeks, ex tax): the Outlook add-in for the organisation, at least 5 named users, a leaderboard, and the implementation plan at week six. The fee comes off the implementation if you sign within 30 days. - **Free** (AU$0): Protection on one job worth under AU$2M. No annual fee. - **Baseline** (AU$55,000/year): Margin protection, one flat annual fee. AU$55,000 a year, flat up to AU$100M of contract value under watch (negotiated above), indexed to ABS CPI at each anniversary and never falling. Protection included. Nothing is billed on cash recovered or avoided cost. - **Enterprise** (bespoke pricing): For parent organisations consolidating across multiple entities, firms running proprietary ERPs that need custom adapter work, and bespoke deployments. Cover of AU$100M+ group-wide, offered on request and by approval. Full comparison: https://demiton.io/en-au/pricing Pilot: https://demiton.io/en-au/pilot ## Documentation - [Docs](https://docs.demiton.io): product documentation, connector reference, API, MCP server - [Register catalogue](https://docs.demiton.io/concepts/register-catalog/): all 182 registers by domain, with status - [The five diseases](https://docs.demiton.io/start-here/diseases/): each disease, the registers that watch for it, and what those registers do today - [Registers](https://docs.demiton.io/concepts/registers/): what a register is and why it is named that way - [Technical llms.txt](https://docs.demiton.io/llms.txt): the documentation site's own map ## Product - [Homepage](https://demiton.io): the entry thesis - [The five diseases](https://demiton.io/diseases): what Demiton prevents, disease by disease - [Contracts and standards](https://demiton.io/standards): TMR, TfNSW and the Australian Standards Demiton holds, clause by clause - [What is the Security of Payment Act?](https://demiton.io/australia/security-of-payment): The Security of Payment Act in every Australian state: when a payment schedule is due, when to apply for adjudication, and the section that says so. - [Payment claims](https://demiton.io/australia/security-of-payment/payment-claims): What a valid payment claim must do under each state's Security of Payment Act, how often you can claim, and what an invalid claim costs, with sections. - [Payment schedules](https://demiton.io/australia/security-of-payment/payment-schedules): Payment schedule deadlines in construction, state by state: business days from the claim, what a late schedule costs, and when payment falls due. - [Adjudication](https://demiton.io/australia/security-of-payment/adjudication): When to give notice, apply for adjudication and respond under each state's Security of Payment Act, in business days, with the section cited. - [Retention](https://demiton.io/australia/security-of-payment/retention): Every retention and security duty the obligation library holds for Australian construction, state by state, with the window, the section and the consequence. - [Supporting statements](https://demiton.io/australia/security-of-payment/supporting-statements): Which Security of Payment Acts require a supporting statement with a payment claim, the section that says so, and what leaving it out costs. - [Missed deadlines](https://demiton.io/australia/security-of-payment/missed-deadlines): Every Security of Payment window in every state, and what the Act records when it is missed: a barred claim, the full amount payable, or an offence. - [By state](https://demiton.io/australia/security-of-payment/by-state): The Security of Payment Act in each state and territory side by side: schedule, payment, notice, adjudication and response windows, each with its section. - [Security of Payment deadline calculator](https://demiton.io/tools/security-of-payment-deadlines): payment schedule and adjudication application due dates for every Australian state, in business days, with the section cited - [What does the WHS Act require?](https://demiton.io/australia/whs): The WHS Act and Regulation in every Australian state, and Victoria's OHS Act: notifiable incidents, SWMS, licences and records, with the section. - [Notifiable incidents](https://demiton.io/australia/whs/notifiable-incidents): When to notify a notifiable incident in every state and Victoria: notify immediately, written notice within 48 hours, keep the record 5 years. - [SWMS](https://demiton.io/australia/whs/swms): When a safe work method statement is required for high risk construction work, who gets a copy and how long it is kept, state by state, with the regulation. - [SWMS template builder](https://demiton.io/australia/whs/swms/builder): Build a SWMS scaffold for your job type and state: the high risk construction work, where the contents are set, and the duties around it, each with its section. - [High risk work licences](https://demiton.io/australia/whs/high-risk-work-licences): Who must hold a high risk work licence, what the contractor must see before work starts, and what counts as high risk construction work, by state. - [Records](https://demiton.io/australia/whs/records): Every WHS record keeping duty the library holds: notifiable incident records, SWMS and underground services records, each with its window and section. - [By state](https://demiton.io/australia/whs/by-state): Every WHS duty the library holds for each Australian state and territory, side by side: the Act, the Regulation, the section, the window and the cost. - [What is an extension of time?](https://demiton.io/australia/extension-of-time): An extension of time is more time to finish. Claim within 28 days under AS 4000 and GC21, 20 business days under the TMR TIC, 14 days under Main Roads WA. - [EOT claims](https://demiton.io/australia/extension-of-time/claims): When the EOT clock starts and how long it runs: 28 days under AS 4000, AS 2124 and GC21, 20 business days under the TMR TIC, 14 days under Main Roads WA. - [Notice of delay](https://demiton.io/australia/extension-of-time/notice-of-delay): A notice of delay comes before the EOT claim. 7 days under GC21, 10 business days for a possible delay under the TMR TIC, promptly under AS 4000 and AS 4902. - [Late claims](https://demiton.io/australia/extension-of-time/late-claims): A late EOT claim is barred under AS 4000, AS 2124, the TMR TIC and Main Roads WA Minor Works. GC21 cuts the extension by a day for each day late. - [CLOCS-A](https://demiton.io/australia/clocs-a): CLOCS-A for Australian construction: who it binds, Bronze, Silver and Gold, and the 30 duties Demiton holds from Standard v1.6, each with its clause. - [Bronze requirements](https://demiton.io/australia/clocs-a/bronze): The 16 CLOCS-A Bronze vehicle equipment items as a printable checklist, and the 21 Transport Operator requirements in clause 5.4, each with its clause. - [CLOCS-A vs TfNSW TS 00088](https://demiton.io/australia/clocs-a/vs-ts-00088): TfNSW TS 00088 beside CLOCS-A for a heavy vehicle on a NSW job: what each binds, the Bronze tier, registration, pre-starts and service records, by clause. - [Heavy vehicle pre-start checklist](https://demiton.io/australia/clocs-a/pre-start-checklist): A printable heavy vehicle pre-start checklist for CLOCS-A and TfNSW TS 00088 jobs: the daily check, defects, the records to keep and the Bronze equipment. - [Traffic management plan](https://demiton.io/australia/clocs-a/traffic-management-plan): What CLOCS-A clause 5.3.4 requires of a construction traffic management plan, who must keep it, and the risk register review beside it, each with its clause. - [Logistics management plan](https://demiton.io/australia/clocs-a/logistics-management-plan): The CLOCS-A construction logistics management plan: the one-month update in Appendix C(j), and how it differs from the traffic management plan, by clause. - [Construction law in Australia](https://demiton.io/australia): The Security of Payment Acts, WHS Acts, AS 4000 and AS 4902 notices, and the Rail Safety National Law for Australian contractors, each with its clause. - [Notices in construction contracts](https://demiton.io/australia/construction-contracts): What AS 4000, AS 4902, AS 2124 and GC21 make you notify, and by when: variation claims within 28 days, latent conditions, the final claim, and what late costs. - [Variation claims](https://demiton.io/australia/construction-contracts/variations): How long to claim a variation: 28 days under AS 4000, AS 4902 and GC21, 20 business days under the TMR TIC, 7 days under TfNSW C41. Which forms bar a late one. - [Time bars](https://demiton.io/australia/construction-contracts/time-bars): Which notices in AS 4000, AS 4902, AS 2124 and GC21 bar a late claim, which cost you damages only, and which carry no penalty: 15 time bars, by clause. - [Final payment claim](https://demiton.io/australia/construction-contracts/final-payment-claim): The final payment claim is the last chance to claim: 91 days after Completion under GC21, 28 days after the last defects period under AS 4902. Late is barred. - [Construction law in Ireland](https://demiton.io/ireland): Ireland's Construction Contracts Act 2013 and Construction Regulations 2013 for contractors: payment claims, adjudication, PSCS, HSA notice, Safe Pass. - [Construction Contracts Act 2013](https://demiton.io/ireland/construction-contracts-act): Ireland's Construction Contracts Act 2013: payment claim notice within 5 days, response within 21 days, payment within 30 days, and adjudication. - [Payment claims](https://demiton.io/ireland/construction-contracts-act/payment-claims): The payment claim notice within 5 days after the claim date, the response within 21 days, payment within 30 days, and pay when paid, under Ireland's Act. - [Adjudication](https://demiton.io/ireland/construction-contracts-act/adjudication): Adjudication under Ireland's Construction Contracts Act 2013: notice of intention, adjudicator within 5 days, referral within 7 days, decision within 28 days. - [Which contracts](https://demiton.io/ireland/construction-contracts-act/which-contracts): Which contracts Ireland's Construction Contracts Act 2013 governs: the start date, the contracts left out, the services it covers, and contracting out. - [Construction Regulations 2013](https://demiton.io/ireland/construction-safety): The Safety, Health and Welfare at Work (Construction) Regulations 2013: appointing the PSCS and PSDP, notifying the HSA, the safety file and Safe Pass. - [PSCS and PSDP](https://demiton.io/ireland/construction-safety/pscs-and-psdp): When the client must appoint a PSCS and a PSDP under Ireland's Construction Regulations 2013, and when a safety adviser or a safety officer is needed. - [Notifying the HSA](https://demiton.io/ireland/construction-safety/notifying-the-hsa): Which construction projects must be notified to the Health and Safety Authority, by the client and by the PSCS, the thresholds, and what goes on site display. - [Safety and health plan, safety file](https://demiton.io/ireland/construction-safety/safety-file): Who develops the safety and health plan before construction starts, who feeds the safety file, and who keeps it after handover, under Ireland's Regulations. - [Safe Pass](https://demiton.io/ireland/construction-safety/safe-pass): Who needs a Safe Pass card and a construction skills card on an Irish site, how long a card lasts, and the first day confirmation the contractor gives the PSCS. - [Construction law in England](https://demiton.io/england): CDM 2015 and the Construction Act 1996 for contractors in England: principal designer and contractor, F10 notice, payment and pay less notices, adjudication. - [CDM Regulations 2015](https://demiton.io/england/cdm-2015): The CDM Regulations 2015 in Great Britain: appointing the principal designer and principal contractor, F10 notification, the construction phase plan, the file. - [Principal designer and principal contractor](https://demiton.io/england/cdm-2015/principal-designer-and-principal-contractor): When the client must appoint a principal designer and a principal contractor under CDM 2015, what each must do, and the duties of every other contractor. - [F10 notification](https://demiton.io/england/cdm-2015/f10-notification): Which construction projects are notifiable under CDM 2015, who notifies the HSE and when, the online F10 form, and displaying the notice in the site office. - [Construction phase plan](https://demiton.io/england/cdm-2015/construction-phase-plan): Who draws up the construction phase plan under CDM 2015 and when, what it covers, the pre-construction information behind it, and the site inspections. - [Health and safety file](https://demiton.io/england/cdm-2015/health-and-safety-file): Who prepares the health and safety file under CDM 2015, what goes in it, who feeds it during the project, and who receives it at the end. - [Domestic clients](https://demiton.io/england/cdm-2015/domestic-clients): When a project is for a domestic client, CDM 2015 passes the client's duties, notifying the HSE included, to the contractor or the principal designer. - [Construction Act 1996](https://demiton.io/england/construction-act): The Construction Act 1996 in England: payment notice within 5 days of the due date, pay less notice, suspension, adjudication in 28 days, and the Scheme. - [Payment and pay less notices](https://demiton.io/england/construction-act/payment-notices): The payment notice within 5 days, the payee's notice, the pay less notice, and the Scheme's defaults: final date in 17 days, pay less 7 days before it. - [Adjudication](https://demiton.io/england/construction-act/adjudication): Adjudication under the Construction Act 1996: notice at any time, referral within 7 days, a decision within 28 days, nominating the adjudicator, and complying. - [Which contracts](https://demiton.io/england/construction-act/which-contracts): Which contracts the Construction Act 1996 governs: construction operations in England, Wales or Scotland, what is left out, and why pay when paid fails. - [CLOCS Standard v5](https://demiton.io/england/clocs): What CLOCS Standard Version 5 requires of clients, principal contractors and fleet operators in England, how it differs from CLOCS-A, each duty with its clause. - [Construction logistics plan](https://demiton.io/england/clocs/construction-logistics-plan): What CLOCS Standard v5 requires of a construction logistics plan, who must keep it and when it is reviewed, each duty with its clause. - [Traffic management plan](https://demiton.io/england/clocs/traffic-management-plan): What CLOCS Standard v5 requires of a construction traffic management plan, vehicle routing, site access, traffic marshals and gate checks, by clause. - [Fleet operators and FORS](https://demiton.io/england/clocs/fleet-operators-and-fors): What CLOCS Standard v5 requires of a fleet operator, how it points to FORS Silver, and the cited note on London's Direct Vision Standard. - [Construction law in South Africa](https://demiton.io/south-africa): South Africa's cidb Act and Regulations, the OHS Act and the Construction Regulations 2014: cidb registration, permits, safety files and incidents. - [cidb registration and grading](https://demiton.io/south-africa/cidb): cidb registration under Act 38 of 2000: who must register, renewal 3 months before expiry, changed particulars within 30 days, and the tender grade. - [Registration](https://demiton.io/south-africa/cidb/registration): Keeping a cidb registration valid: renewal 3 months before expiry, changed particulars within 30 days, the annual fee and confirmation, tax clearance. - [The tender grade](https://demiton.io/south-africa/cidb/tender-grade): cidb grading on a public sector tender: register in the grade and class of works it names or higher, joint ventures, and why the grade table is not here. - [Employer duties](https://demiton.io/south-africa/cidb/employer-duties): The employer's cidb duties on a contract above the threshold: register it within 21 working days, report its status within 1 month, and notify a dispute. - [OHS Act and Construction Regulations](https://demiton.io/south-africa/construction-regulations): The Occupational Health and Safety Act 85 of 1993 and Construction Regulations 2014 on site: the construction work permit, safety plan and file, incidents. - [Construction work permit](https://demiton.io/south-africa/construction-regulations/construction-work-permit): The construction work permit in South Africa: apply at least 30 days before work starts, no work until it is issued, and the notice of work 7 days before. - [Health and safety plan and file](https://demiton.io/south-africa/construction-regulations/health-and-safety-plan-and-file): The health and safety specification, plan and file under South Africa's Construction Regulations 2014, the handover, audits every 30 days and appointments. - [Incidents](https://demiton.io/south-africa/construction-regulations/incidents): Incident reporting under South Africa's OHS Act: notice within 7 days, the forthwith report, the site left undisturbed, investigation within 7 days, records. - [Construction law in Ontario](https://demiton.io/ontario): Ontario's Construction Act, the OHSA and O. Reg. 213/91 for contractors: prompt payment, adjudication, holdback, liens, notice of project and incident notices. - [Construction Act](https://demiton.io/ontario/construction-act): Ontario's Construction Act: notice of non-payment within 14 days, payment within 28 days, a 10% holdback, liens preserved within 60 days, and adjudication. - [Prompt payment](https://demiton.io/ontario/construction-act/prompt-payment): Ontario prompt payment: the proper invoice, a deficiency notice within 7 days, notice of non-payment within 14 days, payment within 28 days, and interest. - [Adjudication](https://demiton.io/ontario/construction-act/adjudication): Ontario construction adjudication: notice within 90 days of completion, documents within 5 days, determination within 30 days, payment within 15 days. - [Holdback, trust funds and bonds](https://demiton.io/ontario/construction-act/holdback): Ontario's 10% construction holdback: who retains it, the annual release notice within 14 days of each anniversary, final release, trust funds and bonds. - [Liens](https://demiton.io/ontario/construction-act/liens): Ontario construction liens: preserve within 60 days, perfect within 90 days, set the action down for trial within 24 months, and substantial performance. - [Construction safety](https://demiton.io/ontario/construction-safety): Ontario's OHSA and O. Reg. 213/91 Construction Projects on site: the notice of project, registration, site notices, and critical injury and accident reports. - [Notice of project](https://demiton.io/ontario/construction-safety/notice-of-project): File a notice of project with the Ministry of Labour before work starts when labour and materials exceed CAD 50,000. Who files, other thresholds, site posting. - [Incident notices](https://demiton.io/ontario/construction-safety/incident-notices): Ontario's OHSA incident notices: critical injuries at once, a written report within 48 hours, accident notice within 4 days, project incidents within 2 days. - [Other site notices](https://demiton.io/ontario/construction-safety/site-notices): Other Ontario site notices: trench and tunnel notices, 48 hours before a suspended platform is used, the constructor's site notice and weekly inspections. - [Construction law in New Zealand](https://demiton.io/new-zealand): New Zealand construction law for contractors: the Construction Contracts Act 2002, NZS 3910 and the Health and Safety at Work Act 2015, with every window. - [Construction Contracts Act](https://demiton.io/new-zealand/construction-contracts-act): New Zealand's Construction Contracts Act 2002: a payment schedule within 20 working days, adjudication, suspension, retention on trust. - [Payment claims and schedules](https://demiton.io/new-zealand/construction-contracts-act/payment-claims): New Zealand payment claims: the valid claim and Form 1, a payment schedule within 20 working days, the default due date, recovering the debt, suspension. - [Adjudication](https://demiton.io/new-zealand/construction-contracts-act/adjudication): New Zealand adjudication: agree an adjudicator within 5 working days, respond within 5 working days, determination within 20 working days. - [Retention money](https://demiton.io/new-zealand/construction-contracts-act/retention): New Zealand retention money: held on trust, a report every 3 months, 10 working days notice before use on a defect, and void release terms. - [NZS 3910](https://demiton.io/new-zealand/nzs-3910): NZS 3910 in New Zealand: variation notice within 1 month, extension of time notice within 20 working days, defects, retention and the final claim. - [Variations and unforeseen conditions](https://demiton.io/new-zealand/nzs-3910/variations-and-unforeseen-conditions): NZS 3910 variations in New Zealand: notice within 1 month of the instruction, the value proposed within 1 month, day works, and unforeseen physical conditions. - [Extensions of time](https://demiton.io/new-zealand/nzs-3910/extensions-of-time): NZS 3910 extension of time in New Zealand: notice within 20 working days, the Engineer's decision within 20 working days, programme and early warning. - [Payment and completion](https://demiton.io/new-zealand/nzs-3910/payment-and-completion): NZS 3910 completion in New Zealand: bond within 2 months, defects notified within 3 months, retention release, final claim and final account. - [Health and safety](https://demiton.io/new-zealand/health-and-safety): New Zealand's Health and Safety at Work Act 2015: notify WorkSafe as soon as possible, written notice within 48 hours, records, notifiable work notice. - [Construction law in Washington](https://demiton.io/washington): Washington State law for contractors: prevailing wage, retainage, bond claims within 30 days, lien claims within 90 days, utility locates, injury reports. - [Public works payment](https://demiton.io/washington/public-works): Getting paid on a Washington public work: the prevailing wage intent and affidavit, 5% retainage, bond claims within 30 days, prompt payment. - [Prevailing wage](https://demiton.io/washington/public-works/prevailing-wage): Washington prevailing wage under RCW 39.12: the statement of intent before any payment, the affidavit of wages paid, monthly certified payroll, apprentices. - [Retainage](https://demiton.io/washington/public-works/retainage): Washington retainage under RCW 60.28: no more than 5%, held in trust, a retainage bond released within 30 days, and release 60 days after completion. - [Bond and retainage claims](https://demiton.io/washington/public-works/bond-and-retainage-claims): Unpaid on a Washington public work: a bond claim within 30 days of acceptance, a retainage lien within 45 days, and the supplier notices. - [Prompt payment](https://demiton.io/washington/public-works/prompt-payment): Washington prompt payment: the public body pays within 30 days, withholding notice within 8 working days, subcontractors paid within 10 days, interest. - [Mechanics' liens](https://demiton.io/washington/mechanics-liens): Washington mechanics' liens under RCW 60.04: notice to owner, record the claim within 90 days, serve the owner within 14 days, foreclose within 8 months. - [Site duties and registration](https://demiton.io/washington/site-duties): Washington site duties: utility locates 2 business days ahead, injury reports within 8 hours, archaeological finds, and contractor registration. - [Utility locates](https://demiton.io/washington/site-duties/utility-locates): Washington's dig law, RCW 19.122: request locates 2 business days ahead, wait for every mark, renew after 45 days, report damage within 45 days. - [Injury reporting](https://demiton.io/washington/site-duties/injury-reporting): Washington injury reporting: a fatality or inpatient hospitalization within 8 hours, an amputation or loss of an eye within 24 hours, and appeals. - [Archaeological finds](https://demiton.io/washington/site-duties/discoveries): Washington discoveries on a construction site: the archaeological permit, native Indian graves, and stopping and reporting skeletal human remains. - [Contractor registration](https://demiton.io/washington/site-duties/contractor-registration): Washington contractor registration under RCW 18.27: register before bidding, keep the bond and insurance, renew every 24 months, use registered subcontractors. - [Le droit des travaux en France](https://demiton.io/fr) (in French): Les délais d'une entreprise de travaux en France : ordre de service, 30 jours sur le décompte général, paiement public sous 30 jours, sous-traitance, DT-DICT. - [Marchés publics de travaux](https://demiton.io/fr/marches-publics) (in French): Marchés publics de travaux : un ordre de service contesté sous 15 jours, paiement sous 30 jours, décompte général sous 30 jours, recours sous 6 mois. - [Ordres de service et prix nouveaux](https://demiton.io/fr/marches-publics/ordres-de-service) (in French): CCAG-Travaux 2021 : observations sur un ordre de service sous 15 jours, prix nouveaux sous 30 jours, refus d'un ordre non valorisé sous 15 jours. - [Délais de paiement et avance](https://demiton.io/fr/marches-publics/delais-de-paiement) (in French): Marchés publics : délai de paiement, intérêts moratoires au taux de la BCE majoré de huit points, indemnité de 40 euros, avance au-delà de 50 000 euros. - [Décompte général et réclamations](https://demiton.io/fr/marches-publics/decompte-general) (in French): CCAG-Travaux 2021 : projet de décompte final sous 30 jours, décompte général signé ou contesté sous 30 jours, recours au tribunal sous 6 mois. - [Prolongation et intempéries](https://demiton.io/fr/marches-publics/prolongation-de-delai) (in French): CCAG-Travaux 2021 : les causes de prolongation du délai d'exécution, les journées d'intempéries et la contestation d'une prolongation refusée. - [Sous-traitance](https://demiton.io/fr/sous-traitance) (in French): Sous-traitance en France : acceptation et agrément (loi de 1975), paiement direct, réponse du titulaire sous 15 jours, action directe, vigilance. - [Retenue de garantie](https://demiton.io/fr/retenue-de-garantie) (in French): La retenue de garantie en France : au plus 5 % en marché privé (loi de 1971) comme en marché public, remplaçable par une caution, libérée après la réception. - [Marchés privés : paiement](https://demiton.io/fr/marches-prives) (in French): Marchés de travaux privés : garantie de paiement (art. 1799-1 du code civil), sursis après 15 jours, paiement sous 60 jours au plus, pénalités et 40 euros. - [Chantier](https://demiton.io/fr/chantier) (in French): Sur le chantier : DICT et réponses des exploitants sous 7 jours, PPSPS sous 30 jours, carte BTP, accident déclaré sous 48 heures, décennale. - [DT-DICT](https://demiton.io/fr/chantier/dt-dict) (in French): DT-DICT : une DICT à chaque exploitant, réponse sous 7 jours, jours fériés non compris, renouvellement après 3 mois, dommages aux réseaux. - [PPSPS, carte BTP et accidents](https://demiton.io/fr/chantier/securite) (in French): Sécurité du chantier : PPSPS sous 30 jours, délai minimal du sous-traitant, transmission à l'inspection du travail, carte BTP, accident déclaré sous 48 heures. - [Découvertes archéologiques](https://demiton.io/fr/chantier/decouvertes-archeologiques) (in French): Découverte archéologique pendant des travaux : déclaration immédiate au maire, objets laissés en place, prolongation et indemnisation du CCAG-Travaux. - [Assurance décennale](https://demiton.io/fr/chantier/assurance-decennale) (in French): Assurance décennale : obligation pour les ouvrages concernés, attestation à l'ouverture du chantier, sanctions, et exclusion d'une grande part du génie civil. - [How it works](https://demiton.io/how-it-works) - [Market](https://demiton.io/market): finding and pursuing civil work - [Projects](https://demiton.io/projects): delivering what you won - [Studio](https://demiton.io/studio): asking questions inside the app - [Ask Demiton over MCP](https://demiton.io/mcp): OAuth-secured connector, tool reference, auth guide - [Agents](https://demiton.io/agents) - [Prequalification](https://demiton.io/prequalification) - [Pricing](https://demiton.io/en-au/pricing) ## Engineering Log Four standing series. Two recur: a Product Update every Monday and a Long Read monthly. Two publish on no fixed beat: Bridgeworks as updates land, and the Product Roadmap when it changes. - [Product Update](https://demiton.io/blog/series/product-update): Every Monday: which of the five margin diseases moved closer to prevented, and what we built, fixed and measured to get it there. Written for the people whose work depends on it, not for a changelog. - Latest: [The email starts the clock](https://demiton.io/blog/product-update-2026-10-19) (2026-10-19) - [Bridgeworks](https://demiton.io/blog/series/bridgeworks): Bridgeworks, our demo company, working a real TMR or TfNSW contract. Published as updates land, on no fixed beat. The five diseases, the registers, and what would have been caught before it cost. Real project, fictional company, real product. - Latest: [Every demo needs a fake company. Ours is Bridgeworks.](https://demiton.io/blog/bridgeworks-demo-company) (2026-09-30) - [Product Roadmap](https://demiton.io/blog/series/product-roadmap): Published when it changes: what is being built, what was cut, and why the order is the way it is. For the people who have to plan around the product. - [Long Read](https://demiton.io/blog/series/long-read): Monthly: one argument, at length. Architecture decisions, procurement policy, and the parts of running jobs through software that nobody writes down. - Latest: [What a sanctions-screening project taught us about matching civil contractors](https://demiton.io/blog/identity-resolution-vs-the-incumbents) (2026-09-25) Feeds: [all posts](https://demiton.io/blog/feed.xml), or a single series with `https://demiton.io/blog/feed.xml?series=`. ## Recent posts - [The email starts the clock](https://demiton.io/blog/product-update-2026-10-19) (2026-10-19): A variation's notice window starts on the day of the direction, and the direction usually arrives as an email. Demiton for Outlook records the email on the job and counts the window from the email's own date. It runs in production today, installed by an organisation's admin from a link. This week it heads for Microsoft's store, so anyone can add it from Outlook: the listing is drafted, and four things stand between it and Microsoft's review. Variations typed into Demiton or read from a document now start their windows too, and the library holds 447 obligations. - [Alerts that reach someone, and 428 obligations](https://demiton.io/blog/product-update-2026-10-12) (2026-10-12): Until last Wednesday, Demiton measured rework, cost drift and disputes on every protected job every hour and told nobody. Now every disease alerts every organisation. Each protected job has its own page, with the contract as Demiton read it and a Confirm beside every term. The obligation library holds 428 obligations from 87 instruments, Ireland, England, Ontario and South Africa among them, added to find where the code still assumes Australia. Apple approved Demiton's developer account, so the iPhone app is coming soon. - [252 obligations, the requests they raise, and who signs them off](https://demiton.io/blog/product-update-2026-10-07) (2026-10-07): Demiton is live in Claude's connector directory. This update is two days late because Monday was a public holiday in Queensland, and since this release Demiton's deadlines know that too. The obligation library has grown from 135 to 252. When a protection fires it now raises a request that one named person answers, carrying its amount and currency. Who signs off is set on one screen, each claim and delay runs its own clock, and a contractor's Navman data now answers CLOCS-A job by job. - [The ledger knew in March: Business Central and the five diseases](https://demiton.io/blog/business-central-five-diseases) (2026-09-30): The job was under margin months before anyone said so out loud, and every fact needed to see it was already posted. Business Central keeps 29 registers current in Demiton, from job cost lines to retention. Covered here: what comes across from your ERP, which of the five margin diseases it helps stop - cost drift above all - and the two diseases it does nothing for. - [Every demo needs a fake company. Ours is Bridgeworks.](https://demiton.io/blog/bridgeworks-demo-company) (2026-09-30): Contoso taught software how to show a real product without a real customer. Bridgeworks is Demiton's Contoso: a fictional civil contractor that works real TMR and TfNSW contracts, so we can show the five diseases catching without pointing at anyone's books. - [Four kinds of protection, what the research says each disease costs, and all 135 obligations](https://demiton.io/blog/product-update-2026-09-28) (2026-09-28): A job's obligations fail in four different shapes, so Demiton protects them four ways: a watch, a countdown, a check and a threshold. This week each one exists, all five diseases run a daily check, and the research behind them is sorted by whose money it measures. Two new public sources back it: research.demiton.io and the demitonapp/registers repository. Below that is every obligation in the library, all 135, with its clause and what missing it costs. - [What a sanctions-screening project taught us about matching civil contractors](https://demiton.io/blog/identity-resolution-vs-the-incumbents) (2026-09-25): We went shopping for entity resolution and priced Senzing, Splink, AWS and the MDM suites. The best answer to our company-name problem turned out to be an open source matcher built to screen sanctions lists. Here is the whole search, what OpenSanctions got right, and what a civil platform has to build that nobody sells. - [Disputes are won in the paperwork, and the paperwork has a deadline](https://demiton.io/blog/product-update-2026-09-21) (2026-09-21): A dispute is usually decided months before anyone argues it, by a notice that went in late or a record nobody kept. This week Demiton learned 125 cited evidence standards across Australia and New Zealand, and started checking every active project against them every morning. Disputes is the second disease with a verdict running every morning. Neither has fired on a live job yet. - [$450,000 in, $175,100 out: what the research says a $5 million civil job keeps](https://demiton.io/blog/what-five-diseases-cost-a-5-million-job) (2026-09-18): A $5 million civil job plans on a $450,000 margin. Published research says it keeps $175,100. Every figure sourced, with the three we cannot measure named. - [The record was already there: Assignar and the five diseases](https://demiton.io/blog/assignar-five-diseases) (2026-09-16): The ticket expired the week the client audited the crew, and the expiry date had been sitting in the field app for a year. Most of what goes wrong on a job is recorded before it goes wrong. This week: what Assignar already holds, which of the five margin diseases it helps stop, and where it stops. - [The model form: what Florence Nightingale would make of 157 registers](https://demiton.io/blog/product-update-2026-09-15) (2026-09-14): Nightingale's hardest fight was not nursing. It was that hospitals recorded the same facts in different shapes, so preventable disease could not be seen, let alone stopped. Civil construction has that problem today. This week we published all 157 register formats, organised Demiton around the diseases that eat a job's margin, put Demiton for Android live on Google Play, and announced forge. - [Demiton for Android is with Google](https://demiton.io/blog/demiton-android-launch) (2026-09-07): The Android app is submitted and in review. Behind it: outcome-driven onboarding, a learning bid queue, cross-system identity, and sourced answers. - [Civil Pipeline #3: TMR is buying, Defence is running, and 349 notices landed this week](https://demiton.io/blog/civil-pipeline-june-2026) (2026-06-02): We said we were building a machine-readable view of the Australian civil procurement market. This is what it shows. 2,079 procurement facts. 11 active tenders. 349 planning notices. Here is what matters to a civil contractor this week. - [Fortnight wrap: Studio becomes the MCP client](https://demiton.io/blog/friday-wrap-2026-05-28) (2026-05-28): Twenty MCP tools became four, and the report tools have since folded into ask_demiton. Three god files got split. A 392-line hotspot that had absorbed 67 commits in 90 days was broken into domain files. And a boolean bypass that lived in six places across the auth stack got replaced with a proper role migration. - [Australia's $70 billion procurement transparency problem (and the open source fix)](https://demiton.io/blog/australia-procurement-transparency-gap) (2026-05-28T08:00:00+10:00): Every Australian state legally requires contract awards to be disclosed. Not one requires them in machine-readable form. The Commonwealth calls OCDS adoption cost-prohibitive while spending $580M to rebuild one website. We're building the fix as open source. ## Open source - [Open source](https://demiton.io/open-source): the Demiton Classifier - GitHub: https://github.com/demitonapp/classifier - PyPI: https://pypi.org/project/demiton-classifier/ - Licence (code): Apache 2.0. Licence (methodology): CC-BY-SA 4.0 - [Methodology](https://demiton.io/methodology): citable classification methodology, version 1 ## Reference - [About](https://demiton.io/about) - [Security](https://demiton.io/security): security posture, data residency, compliance alignment - [Status](https://demiton.io/status) - [Contact](https://demiton.io/contact)