A civil job is priced at a 9.89% margin. Rework alone costs about 10%.*
Demiton fills your registers from the systems you already run, in a published format. It is not another system to log into. It reads the ones you have and watches the five places the margin goes: the notice that went in late, the test result nobody saw, the diary day nobody wrote, the cost code that drifted, the certificate that lapsed. Each is caught in the record that already holds it, before it costs you.
* Planned gross margin on Australian civil and transport work, 9.89%: Love, Irani, Smith, Regan and Liu, 2017. The contractor’s own rework cost, about 10% of contract value: surveys of Australian civil projects. Every figure and its source.
The systems you run each see one piece of it.
Each system you own keeps one kind of record, and keeps it well. None of them reads the others, and every one of the five losses crosses at least two.
- Your finance systemThe cost, by cost code.What happened on site, what the contract says, what was claimed.
- Your field systemThe diary, the crew, the plant, the hours.What any of it cost, and which clause it set running.
- Your payrollThe labour cost.Everything else.
- Your document storeThe contract, the drawings, the notices.It stores them. Nothing in it reads a clause and counts the days.
A missed claim lives in three of them and in none of them. Demiton is the thing that reads across them, and it replaces none of them.
One job, start to finish.
A possible delay on a TMR job has ten business days to live. The crew opens the ground at the culvert on a Tuesday and finds rock where the geotech said clay, and the project manager does what a good one does: reroutes the crew, keeps the pour wet, rings the supplier and writes it in the diary. Clause 35.5(a) is not interested in any of that. If the client has not been told in writing by day ten, the time is gone, and the money with it.
The fact that would have saved the claim was already written down, on the Tuesday, in the diary. What the diary did not have was anything that read it, counted ten business days, and put a drafted notice in front of the project manager on day seven.
That is what Demiton does. The diary entry opens a window. The window belongs to a named person. On day seven the notice is drafted and waiting, with the entry it came from attached. The day a project manager was busy stops being the day the job loses.
TMR Transport Infrastructure Contract, cl 35.5(a): notify a possible delay within 10 business days. Miss it and the entitlement is barred.
How a kept dollar is counted.
When a protection keeps money on the job, the cash recovered is written to the catch ledger and signed off by the person who acted. Only cash recovered counts: an alert nobody acted on is not a catch, and a window that shut is written down as a loss, visible to the person who held it. Demiton is paid one flat fee and nothing on what the ledger shows, so nobody at Demiton is grading their own work.
How it is built.
For the reader who wants the parts. A clause becomes a clock. The clock asks a person. The register keeps the proof.
- ContractTMR TIC cl 35.5(a)
The clause sets a duty.
- ObligationNotify a possible delay in 10 business days
One duty, one window.
- ProtectionA watch, guarding Missed claims
It tracks the window from the day it opens.
- Registercontract_notice
The record the notice is kept in.
- SystemThe system a customer already runs
Systems fill the register.
Read left to right for what Demiton does. The last step points back, because systems fill the registers.
Contracts come in.
Your contract and the law behind it are read into obligations: each one a duty with a window, a consequence and a clause to point at.
Obligations meet protections.
A protection is one of four kinds, and each guards one obligation against one disease. Three clauses from three sources, each landing somewhere different:
- TMR TIC cl 35.5(a)
Notify a possible delay within 10 business days
A watch guards Missed claims.
Miss it and the entitlement is barred.
Evidence register:
contract_notice - TMR MRTS50 cl 10.2
Notify a nonconformance within 1 working day of detecting it
A watch guards Rework.
Miss it and the contract is breached.
Evidence register:
safety_ncrApplies only where one of the clause’s listed triggers holds. Demiton does not collect this register yet.
- TfNSW TS 00088 cl 6.9
Record an inspection of each vehicle and plant item before it starts a shift
A check guards Lapsed compliance.
Miss it and the contract is breached.
Evidence register:
plant_prestart
Four kinds of protection
- Watch
A window opens when something happens, and the deadline is tracked.
- Check
Evidence that must exist is looked for.
- Countdown
A fixed date approaches, flagged at 90, 30 and 7 days with the renewal attached.
- Threshold
A measure is tracked against the line it must not cross.
Five diseases, caught where they start
- ReworkInspection and test results, NCRs, site inspectionsThe failed result reaches the person who can stop the next stage the day it lands.
- Missed claimsVariations, change events, progress claims, contract terms, site diaries alongside weather observationsThe notice is drafted, and the rain day claimed, before the window shuts while the ground is still wet.
- DisputesSite diaries, day works dockets, RFIs, contract termsA missing day's record is flagged while people still remember the day.
- Cost driftBudget against actual, by cost code, against the price you quotedDrift is flagged at AU$50K, not AU$5M.
- Lapsed complianceCertificates, insurances, prequalificationEvery expiry counts down at 90, 30 and 7 days, with the renewal attached.
Each protection runs on its own clock.
When a clock needs a person, it asks a named person for one of three things:
Read this
A protection sends a person a message: here is the notice, read it.
Decide this
A protection asks a named person for a decision, and records who made it.
Send proof
A protection asks a worker for evidence, and a photo counts only once a second person approves it.
Registers hold the facts.
A register is one kind of record kept in one agreed format. Every register format is published as JSON Schema.
Every register format, publishedSystems fill the registers.
Demiton reads the systems you already run. These are the connectors that are released today.
Field and workforce
Assignar
Hilti ON!Track
Finance and payroll
Xero
Employment Hero Payroll
Dynamics 365 Business Central
Documents and identity
SharePoint
Dropbox
Microsoft Entra ID
ExcelUploaded as a file
Prove it on your own jobs first.
The reference that counts is your own ledger, not ours. Free covers one job with no card. The pilot runs on the jobs you have open now, and the first-year study inside a licence is written from your registers.
If it doesn’t show up in your margins, stop paying us.
Every fact keeps its source.
Each fact carries the date it landed, the system it came from and who or what produced it. When a fact changes, the old version keeps its history, and an answer in Claude or ChatGPT points back at the record.
Every job teaches the next. What the last job actually cost, which rates held, which site conditions drove a variation: the next estimate starts from what happened, not a blank sheet.
Every job leaves a trail. Civil Memory remembers it. Margins improve.
Ask Demiton over MCP