Washington State guide

Washington State

Which laws set a contractor's payment and site duties in Washington State?

Three groups of statutes do most of the work on a Washington construction job. On a public work, the prevailing wage, retainage and bond chapters decide when you are paid. On private work, the lien chapter protects payment if you record a claim within 90 days. On every site, you request utility locates and report serious injuries.

Getting paid on a public work

Before any sum due on a public works contract is paid, the disbursing officer must require a statement from the contractor and from each subcontractor at every tier (RCW 39.12.040(1)(a)). The public body keeps no more than 5% as retainage and releases it 60 days after completion, once the affidavits of wages paid and the state's releases are in. An unpaid party claims on the contractor's bond within 30 days of acceptance.

How public works payment works.

Private work: mechanics' liens

A claim of lien is recorded within 90 days after you last furnish, and enforced within 8 months of recording. It may be given at any time but protects only what was supplied after the date 60 days before it is mailed by certified or registered mail, or delivered personally with a signed receipt or an affidavit of service (RCW 60.04.031(1)).

The lien deadlines.

On site

Utility locates are requested at least 2 business days before digging, and a fatality or inpatient hospitalization is reported to Labor and Industries within 8 hours.

The site duties.

What this page is, and is not

It is the section text this library holds for Washington State, read from the Revised Code of Washington and the Washington Administrative Code, among them chapter 39.12 RCW, chapter 60.04 RCW and chapter 19.122 RCW, with the window and the consequence. It is not legal advice, and it is not a substitute for reading the statutes, the contract you signed and its specifications.

Demiton does not track jobs in Washington yet. These pages set out the duties the library holds for a Washington job, so you can check your own.

No library of law is complete, and Demiton never says this one is. An obligation the library does not hold, and you did not add, is not protected. You can add your own to any job.

Common questions

Which laws set a contractor's duties in Washington State?

Three groups of statutes do most of the work on a Washington construction job. On a public work, the prevailing wage, retainage and bond chapters decide when you are paid. On private work, the lien chapter protects payment if you record a claim within 90 days. On every site, you request utility locates and report serious injuries.

When must the prevailing wage intent be filed?

Before any sum due on a public works contract is paid, the disbursing officer must require a statement from the contractor and from each subcontractor at every tier (RCW 39.12.040(1)(a)).

When is a bond claim due on a Washington public work?

The 30 days run from the completion of the contract with an acceptance of the work by the affirmative action of the public body (RCW 39.08.030(1)(a)). The window is 30 days.

When must a mechanics' lien be recorded in Washington?

Within 90 days after you last furnish. The recording period is a period of limitation, and no action to foreclose may be maintained on a claim not recorded within it (RCW 60.04.091).

How far ahead must utility locates be requested?

The notice must give a work-to-begin date not less than 2 and not more than 10 full business days from the day notice is given, unless the excavator and the facility operators agree otherwise in writing (s 19.122.020(40), 19.122.030(1)(a), (2)).

Does Demiton hold every Washington duty?

No library of law is complete, and Demiton never says this one is. An obligation the library does not hold, and you did not add, is not protected. You can add your own to any job.