AS 4902-2000 General Conditions of Contract for Design and Construct (AS 4902-2000)
conditions of contract, published by Standards Australia, 2000, incorporating Amendment No. 1 (reissued March 2005). Commonwealth of Australia.
Noble and overburdened. It signs up to carry the whole design on its back so the principal does not have to, and then discovers that single point of responsibility is a euphemism for you.
4 obligations, clause by clause.
Four obligations: the three that AS4000 and AS2124 also carry, plus the Final Payment Claim. The register records the extension-of-time bar as contested, because clauses 41.2 and 34.5 pull against it, and that dissent is on the page rather than smoothed over.
| Where it is written | The obligation | Window | If missed | Disease |
|---|---|---|---|---|
| cl 34.2, 34.3, 34.5 | Claim an extension of time within 28 days of when the delay's cause should reasonably have been knownheld in the contract_notice register | 28 days | barred | Missed claims |
| cl 25.2, 25.3 | Notify a latent condition promptly, and before disturbing it where possibleheld in the contract_notice register | none set | costs excluded | Missed claims |
| cl 41.1-41.3 | Notify a claim as soon as practicable and give its particulars within 28 days of the noticeheld in the contract_notice register | 28 days | damages only | Missed claims |
| cl 37.4 | Give the Final Payment Claim within 28 days after the last defects liability period expiresheld in the contract_notice register | 28 days | barred | Disputes |
What this page is, and is not.
It is the clause text this library holds for this document, with the window and the consequence. It is not legal advice, and it is not a substitute for reading the document you signed.
No library of law is complete, and Demiton never says this one is. An obligation the library does not hold, and you did not add, is not protected. You can add your own to any job.
Common questions
What does AS 4902-2000 cl 34.2, 34.3, 34.5 require?
Claim an extension of time within 28 days of when the delay's cause should reasonably have been known. Missing it: barred. The window is 28 days. Demiton watches it against the contract_notice register.
What does AS 4902-2000 cl 25.2, 25.3 require?
Notify a latent condition promptly, and before disturbing it where possible. Missing it: costs excluded. The clause sets no day count. Demiton watches it against the contract_notice register.
What does AS 4902-2000 cl 41.1-41.3 require?
Notify a claim as soon as practicable and give its particulars within 28 days of the notice. Missing it: damages only. The window is 28 days. Demiton watches it against the contract_notice register.
What does AS 4902-2000 cl 37.4 require?
Give the Final Payment Claim within 28 days after the last defects liability period expires. Missing it: barred. The window is 28 days. Demiton watches it against the contract_notice register.
Does Demiton hold every obligation in AS 4902-2000 General Conditions of Contract for Design and Construct?
No library of law is complete, and Demiton never says this one is. An obligation the library does not hold, and you did not add, is not protected. You can add your own to any job.
More in Commonwealth of Australia
- AS 2124-1992 General Conditions of Contract3 obligations · The old one in the yellow cover.
- AS 4000-1997 General Conditions of Contract3 obligations · The benchmark, in name only.
- Job budget tolerance (the contractor's own commitment)1 obligation
- Fair Work Act 2009 (Cth)1 obligation
- Society of Construction Law Delay and Disruption Protocol1 obligation · The guidance everyone cites and nobody contracts to.
- Taxation Administration Act 1953 (Cth), Schedule 11 obligation