National Prequalification System for Civil (Road and Bridge) Construction Contracts (November 2024)
licence, published by Queensland Department of Transport and Main Roads, November 2024, Transport and Main Roads for the NPS Management Committee. Commonwealth of Australia.
2 obligations, clause by clause.
2 obligations transcribed from the licence, each held with its clause, the window it sets and what missing it costs.
| Where it is written | The obligation | Window | If missed | Disease |
|---|---|---|---|---|
| cll 3, 6.2 | Hold and maintain the principal's prequalification standing at the level the work type requires, for as long as the work is being tendered or deliveredheld in the prequalification register | none set | the claim is barred | Missed claims |
| cl 8.5 | Tell the principal in writing, immediately, about any change of circumstance that may be material to the standingheld in the contract_notice register | none set | a breach of contract | Missed claims |
What this page is, and is not.
It is the clause text this library holds for this document, with the window and the consequence. It is not legal advice, and it is not a substitute for reading the document you signed.
No library of law is complete, and Demiton never says this one is. An obligation the library does not hold, and you did not add, is not protected. You can add your own to any job.
Common questions
What does National Prequalification System for Civil (Road and Bridge) Construction Contracts (November 2024) cll 3, 6.2 require?
Hold and maintain the principal's prequalification standing at the level the work type requires, for as long as the work is being tendered or delivered. Missing it: the claim is barred. The clause sets no day count. Demiton watches it against the prequalification register.
What does National Prequalification System for Civil (Road and Bridge) Construction Contracts (November 2024) cl 8.5 require?
Tell the principal in writing, immediately, about any change of circumstance that may be material to the standing. Missing it: a breach of contract. The clause sets no day count. Demiton watches it against the contract_notice register.
Does Demiton hold every obligation in National Prequalification System for Civil (Road and Bridge) Construction Contracts (November 2024)?
No library of law is complete, and Demiton never says this one is. An obligation the library does not hold, and you did not add, is not protected. You can add your own to any job.
More in Commonwealth of Australia
- AS 2124-1992 General Conditions of Contract3 obligations · The old one in the yellow cover.
- AS 4000-1997 General Conditions of Contract3 obligations · The benchmark, in name only.
- AS 4902-2000 General Conditions of Contract for Design and Construct4 obligations · The one who carries everything.
- Building and Construction General On-site Award 2020 (MA000020)1 obligation
- Construction Logistics and Community Safety - Australia (CLOCS-A) Standard14 obligations
- Job budget tolerance (the contractor's own commitment)1 obligation
- Repeat purchases (the contractor's own commitment)1 obligation
- Fair Work Act 2009 (Cth)1 obligation